Grid connection · England, United Kingdom
Newthorpe Sewerage Treatment Works Wind Turbines grid connection
Newthorpe Sewerage Treatment Works Wind Turbines grid connection is a grid connection in England, United Kingdom.
We hold more on this right.Attached to, capacity, connection date, grid operator, holder, location, status, technology and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | NEWTHORPE SEWERAGE TREATMENT WORKS WIND TURBINES grid connection | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Location | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Status | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Holder | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Attached to | Available on request | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Technology | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Grid operator | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Connection date | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Voltage | Available on request | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
| Coordinates | 52.9992, -1.2910 | NGED Connected Data portal · Terms not verified · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its owner? Ask us.
Nearby
Within 50 km of this grid connection: 492 power plants (168 operating, 1,475 MW), 67 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Newthorpe Wind Turbine | Power plant | 2.5 MW | Operating | 0.3 km |
| Heanor Road - Battery Energy Storage System | Power plant | 40 MW | Permitted | 4.3 km |
| Moto Hospitality, Trowell Services Area North - Solar Farm & Battery | Power plant | 16.1 MW | Planned | 4.5 km |
| nLighten Nottingham | Data center | — | — | 5.2 km |
| Chesterfield to Willington | Transmission line | — | Planned | 11 km |
| Experian | Data center | — | — | 17 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 32 km |
| Digital Space DC - Newark | Data center | — | — | 35 km |
| Dronfield | Substation | — | — | 35 km |
Place
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.