Power plant · Amber Valley, England, United Kingdom

Heanor Road - Battery Energy Storage System

Heanor Road - Battery Energy Storage System is a permitted power plant in Amber Valley, England, United Kingdom, with 40 MW of capacity, operated by Downing Energy Development Company Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAmber Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNe/O Heanor Road,Heanor, DE75 7AADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Feb 2025 (permit AVA/2024/0059, Town and Country Planning Act, issued by Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Feb 2024 (reference AVA/2024/0059, planning authority Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Feb 2025 (granted, reference AVA/2024/0059, planning authority Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDowning Energy Development Company LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0145, -1.3500DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Heanor Road - Battery Energy Storage System is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England836th of 2,174186,088 MW<0.1%
United Kingdom1,342nd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,556th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 71 substations, 61 grid connections (29 operating, 326 MW), 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned6.4 km
nLighten NottinghamData center——9.1 km
ExperianData center——20 km
DronfieldSubstation——33 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating34 km
GreenhillSubstation——36 km
JordanthorpeSubstation——36 km
Weston Marsh to East LeicestershireTransmission line—Planned36 km
Battery storage and Solar 35 MW grid connection at Bochum Parkway Combined TechGrid connection35 MWPlanned36 km