Grid connection · England, United Kingdom

Moor House Solar Park grid connection

Moor House Solar Park grid connection is a grid connection in England, United Kingdom, with 4.59 MW of capacity, held by Moor House Farm Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMOOR HOUSE SOLAR PARK grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at HDA NO1 & HDA NO2)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderMoor House Farm Solar LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStainburn & Siddick BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMoorhouse Farm (matched by coordinates+technology+capacity, 0.05 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity4.59 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Nov 2016SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates54.6151, -3.5266SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Moorhouse Farm
  2. Permit granted: Moorhouse Farm (appeal granted, planning authority Cumberland, reference 2/2014/0899)
  3. Permit granted: Moorhouse Farm (planning authority Cumberland, reference 2/2014/0899)
  4. Permit refused: Moorhouse Farm (planning authority Cumberland, reference 2/2014/0899)
  5. Permit applied for: Moorhouse Farm (planning authority Cumberland, reference 2/2014/0899)

How it compares

Moor House Solar Park grid connection is the 1,759th-largest of 2,533 grid connections in England and the 2,728th-largest of 3,903 in the United Kingdom by capacity; its 4.59 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,759th of 2,533319,370 MW<0.1%
United Kingdom2,728th of 3,903446,745 MW<0.1%
All grid connections in our data6,707th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 105 power plants (38 operating, 409 MW) and 37 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Moorhouse FarmPower plant5 MWOperating0.0 km
HDA NO2Substation——0.2 km
Dobies Business ParkPower plant1.6 MWCancelled0.6 km
Leyland NationalSubstation——0.8 km
HDA NO1Substation——0.9 km
Lillyhall Wind FarmPower plant9.2 MWCancelled1.4 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page