RARE CONTEXT Request research

Grid connection · England, United Kingdom

Manor Farm grid connection

Manor Farm grid connection is a planned grid connection in England, United Kingdom, with 99.9 MW of capacity, held by Aura Power Solar UK Limited.

Map: where Manor Farm grid connection lies
51.0971, 0.8429 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Richborough/Sellindge 132kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderAura Power Solar UK LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity99.9 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date8 Nov 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.0971, 0.8429UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Manor Farm grid connection is the 355th-largest of 3,539 grid connections in England and the 458th-largest of 4,870 in the United Kingdom by capacity; its 99.9 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England355th of 3,539341,715 MW<0.1%
United Kingdom458th of 4,870467,981 MW<0.1%
All grid connections in our data3,209th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 191 power plants (71 operating, 4,519 MW), 121 substations, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Warehorne 11kVSubstation——3.9 km
Kenardington Place FarmPower plant7 MWOperating4.4 km
Ruckinge Grid 33kVSubstation——4.5 km
Kenardington 6.6kVSubstation——4.7 km
Appledore Road, Kenardington - Solar FarmPower plant35 MWPlanned5.3 km
Stonestreet Green SolarPower plant99.9 MWPermitted6.6 km
Sota DatacentreData center——25 km
CustodianDC MaidstoneData center——29 km
CXD Infrastructure SolutionsData center——29 km

Holder, grid operator and place

More from Aura Power Solar UK Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page