Grid connection · England, United Kingdom

Langage grid connection

Langage grid connection is a grid connection in England, United Kingdom, with 905 MW of capacity, held by EP Langage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Langage 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (built)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderEP Langage LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toLangageNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity905 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyCCGT (Combined Cycle Gas Turbine)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Langage grid connection is the 151st-largest of 2,533 grid connections in England and the 209th-largest of 3,903 in the United Kingdom by capacity; its 905 MW is 0.2% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England151st of 2,533319,370 MW0.28%
United Kingdom209th of 3,903446,745 MW0.2%
All grid connections in our data339th of 7,6161,281,251 MW<0.1%

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom