RARE CONTEXT Request research

Grid connection · England, United Kingdom

Landfill Generation Phs1 grid connection

Landfill Generation Phs1 grid connection is a grid connection in England, United Kingdom, with 3 MW of capacity, held by Non Fossil Purchasing Agency Limited.

Map: where Landfill Generation Phs1 grid connection lies
51.0996, -0.3197 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Horsham Grid 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderNon Fossil Purchasing Agency LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHorsham Grid 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity3 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date10 Jun 2000UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.0996, -0.3197UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Landfill Generation Phs1 grid connection is the 2,757th-largest of 3,539 grid connections in England and the 3,794th-largest of 4,870 in the United Kingdom by capacity; its 3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,757th of 3,539341,715 MW<0.1%
United Kingdom3,794th of 4,870467,981 MW<0.1%
All grid connections in our data7,518th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 380 substations, 214 power plants (85 operating, 1,134 MW) and 78 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Brookhurst Wood Gas to EnergyPower plant5.1 MWOperating0.4 km
Langhurst Wood Road - Hydrogen Generation FacilityPower plant2 MWCancelled0.4 km
Brookhurst Wood (Waste AD)Power plant4.5 MWOperating0.5 km
Horsham Grid 11kVSubstation——4.0 km
Southgate 11kVSubstation——8.2 km
IBM HorshamData center——8.9 km
Five Oaks PrimarySubstation——9.1 km
Digital Realty LGW15Data center——10 km
Digital Realty LGW16Data center——11 km

Holder, grid operator and place

More from Non Fossil Purchasing Agency Limited