Grid connection · England, United Kingdom

Land To The North Of Sewage Works grid connection

Land To The North Of Sewage Works grid connection is a planned grid connection in England, United Kingdom, with 49.5 MW of capacity, held by Cuxton Energy Storage Limited.

Map: where Land To The North Of Sewage Works grid connection lies
51.3710, 0.4547 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Kingsnorth)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCuxton Energy Storage LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity49.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date16 Aug 2017UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Dec 2024 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.3710, 0.4547UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Land To The North Of Sewage Works grid connection is the 803rd-largest of 3,539 grid connections in England and the 1,139th-largest of 4,870 in the United Kingdom by capacity; its 49.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England803rd of 3,539341,715 MW<0.1%
United Kingdom1,139th of 4,870467,981 MW<0.1%
All grid connections in our data4,333rd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 402 substations, 330 power plants (128 operating, 7,415 MW), 57 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sundridge HillPower plant49.5 MWUnder construction1.2 km
Halling 11kVSubstation——1.4 km
Medway Grid 33kVSubstation——2.1 km
Medway 11kVSubstation——2.1 km
Wouldham Road, Wouldham - Battery Storage FacilityPower plant7.5 MWCancelled2.2 km
Biossence Solar ParkPower plant4.5 MWOperating6.0 km
CustodianDC MaidstoneData center——12 km
CXD Infrastructure SolutionsData center——12 km
CustodianDC DA2Data center——16 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom