Land at High Park Foot grid connection is a planned grid connection in England, United Kingdom, with 21.1 MW of capacity, held by EEB17 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLAND AT HIGH PARK FOOT grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Carlisle)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderEEB17 LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCarlisle BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toHigh Parkfoot Farm (matched by shared name+coordinates+technology+capacity, 0.02 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity21.1 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North WestSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date21 Apr 2015SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date1 Jan 2025 (target energisation)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates55.0563, -2.7680SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: High Parkfoot Farm (planning authority Cumberland, reference 18/0197)
  2. Permit applied for: High Parkfoot Farm (planning authority Cumberland, reference 18/0197)

How it compares

Land at High Park Foot grid connection is the 986th-largest of 2,533 grid connections in England and the 1,602nd-largest of 3,903 in the United Kingdom by capacity; its 21.1 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England986th of 2,533319,370 MW<0.1%
United Kingdom1,602nd of 3,903446,745 MW<0.1%
All grid connections in our data5,195th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 137 power plants (35 operating, 577 MW), 33 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
High Parkfoot FarmPower plant20 MWCancelled0.0 km
Kinkry HillSubstation——1.4 km
Leaps Rigg - Solar FarmPower plant49.9 MWCancelled6.0 km
Askerton CastleSubstation——6.2 km
EastonSubstation——7.9 km
Cross Border Connection (England)Transmission line—Planned9.7 km
Hallburn FarmPower plant13.2 MWOperating11 km