Grid connection · England, United Kingdom

Land at Brook Farm grid connection

Land at Brook Farm grid connection is a grid connection in England, United Kingdom.

We hold more on this right.Capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLAND AT BROOK FARM grid connectionNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates53.0296, -1.3749NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 478 power plants (162 operating, 1,466 MW), 69 substations, 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hl Plastics Extrusions, Flamstead House Hall Road - Solar PanelsPower plant4.1 MWPermitted2.2 km
Heanor Road - Battery Energy Storage SystemPower plant40 MWPermitted2.4 km
Derby Road - Battery Energy Storage SystemPower plant40 MWPlanned3.1 km
Chesterfield to WillingtonTransmission line—Planned4.4 km
nLighten NottinghamData center——11 km
ExperianData center——23 km
DronfieldSubstation——31 km
GreenhillSubstation——34 km
Baslow RoadSubstation——34 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page