Grid connection · England, United Kingdom

Knightsbridge Farm grid connection

Knightsbridge Farm grid connection is a planned grid connection in England, United Kingdom, with 48.1 MW of capacity, held by Renewable Connections Storage Holdings Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceKNIGHTSBRIDGE FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connection site: YARNTON)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderRenewable Connections Storage Holdings LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toYarnton BSP (via: bsp)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity48.1 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date22 Sept 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Oct 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.8076, -1.3016SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Knightsbridge Farm grid connection is the 696th-largest of 2,678 grid connections in England and the 1,127th-largest of 4,493 in the United Kingdom by capacity; its 48.1 MW is <0.1% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England696th of 2,678322,469 MW<0.1%
United Kingdom1,127th of 4,493459,551 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 143 substations, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Yarnton PrimarySubstation——0.2 km
Yarnton BSPSubstation——0.3 km
Lovelace Road PrimarySubstation——2.9 km

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page