KIDDS Transport BESS grid connection

KIDDS Transport BESS grid connection is a planned grid connection in England, United Kingdom, with 25 MW of capacity, held by Energi Generation 12 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceKIDDS TRANSPORT BESS grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Lancaster)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
HolderEnergi Generation 12 LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCaton Road, Lancaster - Battery Storage Facility (matched by coordinates+technology+capacity+company, 0.16 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toLancaster BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity25 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date1 Oct 2021SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates54.0697, -2.7818SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Caton Road, Lancaster - Battery Storage Facility (planning authority Lancaster, reference 21/01351/FUL)
  2. Permit applied for: Caton Road, Lancaster - Battery Storage Facility (planning authority Lancaster, reference 21/01351/FUL)

How it compares

KIDDS Transport BESS grid connection is the 928th-largest of 2,533 grid connections in England and the 1,482nd-largest of 3,903 in the United Kingdom by capacity; its 25 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England928th of 2,533319,370 MW<0.1%
United Kingdom1,482nd of 3,903446,745 MW<0.1%
All grid connections in our data5,039th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 183 power plants (65 operating, 1,117 MW), 149 substations, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Caton Road, Lancaster - Battery Storage FacilityPower plant25 MWPermitted0.2 km
LancasterSubstation——0.3 km
Lancaster BSPSubstation——0.3 km
Moorside Farm - Solar FarmPower plant28 MWPermitted1.2 km
Spring Garden St 11kVSubstation——2.7 km
Salt Ayre Leisure Centre - Solar FarmPower plant3 MWPermitted3.2 km
East Irish Sea Transmission ProjectTransmission line—Planned21 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled22 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted38 km

Holder, grid operator and place

More from Energi Generation 12 Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom