Grid connection · England, United Kingdom

Jameson Road Landfill grid connection

Jameson Road Landfill grid connection is a planned grid connection in England, United Kingdom, with 1.1 MW of capacity, connected by Electricity North West Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceJAMESON ROAD LANDFILL grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEnglandSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity1.1 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date2 Mar 2026SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage6.6 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.9044, -3.0179SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Jameson Road Landfill grid connection is the 2,451st-largest of 2,533 grid connections in England and the 3,785th-largest of 3,903 in the United Kingdom by capacity; its 1.1 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,451st of 2,533319,370 MW<0.1%
United Kingdom3,785th of 3,903446,745 MW<0.1%
All grid connections in our data7,801st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 213 power plants (75 operating, 1,694 MW), 145 substations, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fleetwood Energy CentrePower plant10 MWCancelled0.0 km
Jameson RoadPower plant4.3 MWOperating0.3 km
Fleetwood Water Treatment WorksPower plant1.3 MWOperating0.7 km
RossallSubstation——1.1 km
Copse RDSubstation——1.2 km
CleveleysSubstation——2.7 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled2.8 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted15 km
East Irish Sea Transmission ProjectTransmission line—Planned18 km

Grid operator and place

More from Electricity North West Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom