Grid connection · England, United Kingdom

High Marnham 400 grid connection

High Marnham 400 grid connection is a grid connection in England, United Kingdom, with 1,000 MW of capacity, held by Enso Green Holdings X Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: High Marnham 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (stage 2, Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (stage 1, Awaiting Consents)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderEnso Green Holdings X LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toHigh Marnham 400NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2034 (stage 2, cumulative 1,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

High Marnham 400 grid connection is the 76th-largest of 2,678 grid connections in England and the 118th-largest of 4,493 in the United Kingdom by capacity; its 1,000 MW is 0.22% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England76th of 2,678322,469 MW0.31%
United Kingdom118th of 4,493459,551 MW0.22%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 1,000 MW in total

Holder, grid operator and place