Grid connection · England, United Kingdom

Gateway Energy Centre Power Station grid connection

Gateway Energy Centre Power Station grid connection is a permitted grid connection in England, United Kingdom, with 1,000 MW of capacity, held by Gateway Energy Centre Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Coryton South 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (consents approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderGateway Energy Centre LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toGateway Energy Centre Power StationNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2029 (stage 2, cumulative 1,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Jun 2029 (stage 1, cumulative 450 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Gateway Energy Centre Power Station grid connection is the 76th-largest of 2,533 grid connections in England and the 118th-largest of 3,903 in the United Kingdom by capacity; its 1,000 MW is 0.22% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England76th of 2,533319,370 MW0.31%
United Kingdom118th of 3,903446,745 MW0.22%
All grid connections in our data223rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 450 MW in total
  2. Stage 2 due to connect, 1,000 MW in total

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom