Grid connection · England, United Kingdom

Gascoyne Solar Farm grid connection

Gascoyne Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 60 MW of capacity, held by QE Development Holdco Limited.

Map: where Gascoyne Solar Farm grid connection lies
51.6930, -0.2183 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Brimsdown (EPN))UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderQE Development Holdco LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity60 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date28 May 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.6930, -0.2183UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Gascoyne Solar Farm grid connection is the 546th-largest of 3,539 grid connections in England and the 726th-largest of 4,870 in the United Kingdom by capacity; its 60 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England546th of 3,539341,715 MW<0.1%
United Kingdom726th of 4,870467,981 MW<0.1%
All grid connections in our data3,728th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 565 substations, 421 power plants (159 operating, 3,980 MW), 143 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Land At Swanland RoadPower plant5 MWOperating0.4 km
Wrotham Park - Solar PanelsPower plant30 MWPlanned1.4 km
West Potters Bar Primary 11kVSubstation——1.9 km
Potters Bar Solar FarmPower plant5 MWOperating2.2 km
Central Potters Bar Primary 11kVSubstation——2.8 km
East Barnet Primary 11kVSubstation——3.6 km
Soverign Data Centre - Metro PointData center——6.6 km
BT Computer CentreData center——11 km
Google Waltham CrossData center88 MWOperating12 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom