Grid connection · England, United Kingdom

Fulscot Farm Gas grid connection

Fulscot Farm Gas grid connection is a planned grid connection in England, United Kingdom, with 7.56 MW of capacity, held by Fulscot Power Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceFULSCOT FARM GAS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Fulscot)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderFulscot Power LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFulscot Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity7.56 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyADVANCED FUEL GASIFICATION OR PYROLYSISSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date12 Sept 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date13 Dec 2025 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage11 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.5976, -1.2119SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Fulscot Farm Gas grid connection is the 1,476th-largest of 2,533 grid connections in England and the 2,328th-largest of 3,903 in the United Kingdom by capacity; its 7.56 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,476th of 2,533319,370 MW<0.1%
United Kingdom2,328th of 3,903446,745 MW<0.1%
All grid connections in our data6,264th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 328 power plants (115 operating, 1,717 MW), 230 substations and 65 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fulscot PrimarySubstation——0.5 km
AWS Didcot Data CentreData center——4.1 km
Appleford - Battery Energy StoragePower plant300 MWPermitted4.4 km
Sutton CourtneyPower plant6 MWOperating4.9 km
Wallingford PrimarySubstation——5.2 km
Sutton Courtenay Landfill SchemePower plant5.6 MWOperating5.3 km
Milton PrimarySubstation——5.6 km
R89Data center——7.6 km
University Shared Data CentreData center——18 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page