FDG F-02 Land At Chittering Drove grid connection

FDG F-02 Land At Chittering Drove grid connection is a planned grid connection in England, United Kingdom, with 9.58 MW of capacity, held by North Fen Solar Energy Limited.

Map: where FDG F-02 Land At Chittering Drove grid connection lies
52.3081, 0.1969 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Histon Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderNorth Fen Solar Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity9.58 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date23 Feb 2018UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date6 Jan 2025 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.3081, 0.1969UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

FDG F-02 Land At Chittering Drove grid connection is the 1,890th-largest of 3,539 grid connections in England and the 2,658th-largest of 4,870 in the United Kingdom by capacity; its 9.58 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,890th of 3,539341,715 MW<0.1%
United Kingdom2,658th of 4,870467,981 MW<0.1%
All grid connections in our data6,307th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 350 power plants (142 operating, 3,147 MW), 121 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ely Road Waste Management ParkPower plant1.1 MWOperating1.4 km
Waterbeach Waste Management ParkPower plant27.4 MWCancelled1.7 km
Chittering Solar Farm ExtensionPower plant6.3 MWOperating1.8 km
Landbeach Primary 11kVSubstation——2.4 km
Ely Primary 11kVSubstation——3.9 km
Aldreth Primary 11kVSubstation——6.1 km
Redcentric CambridgeData center——9.2 km
West Cambridge Data CentreData center——14 km
US Air Force data center, BrandonData center——26 km

Holder, grid operator and place

Other grid connections in England