Grid connection · England, United Kingdom

FDG B-02 Stonehouse Road grid connection

FDG B-02 Stonehouse Road grid connection is a grid connection in England, United Kingdom, with 5 MW of capacity, connected by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where FDG B-02 Stonehouse Road grid connection lies
52.6859, 1.3953 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Thorpe Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date12 Nov 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.6859, 1.3953UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

FDG B-02 Stonehouse Road grid connection is the 2,306th-largest of 3,539 grid connections in England and the 3,191st-largest of 4,870 in the United Kingdom by capacity; its 5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,306th of 3,539341,715 MW<0.1%
United Kingdom3,191st of 4,870467,981 MW<0.1%
All grid connections in our data6,884th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 187 power plants (62 operating, 995 MW), 77 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Salhouse Solar FarmPower plant5 MWOperating0.7 km
Wroxham Primary 11kVSubstation——3.4 km
Land off Belaugh RoadPower plant12 MWCancelled3.7 km
Belaugh Road Solar FarmPower plant12 MWCancelled4.0 km
Sprowston Primary 11kVSubstation——5.0 km
Hemblington Primary 11kVSubstation——5.1 km
Norwich to TilburyTransmission line—Planned15 km

Grid operator and place

More from Eastern Power Networks plc

Other grid connections in England

All 4837 grid connections in England, United Kingdom