Grid connection · England, United Kingdom

Exeter BESS grid connection

Exeter BESS grid connection is a grid connection in England, United Kingdom, with 680 MW of capacity, held by Exeter Storage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Exeter 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (stage 2, Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (stage 1, Consents Approved)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderExeter Storage LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toExeter BESSNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity680 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Aug 2027 (stage 1, cumulative 290 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2037 (stage 2, cumulative 680 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection gateGate 2 (stage 1)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Exeter BESS grid connection is the 210th-largest of 2,678 grid connections in England and the 288th-largest of 4,493 in the United Kingdom by capacity; its 680 MW is 0.15% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England210th of 2,678322,469 MW0.21%
United Kingdom288th of 4,493459,551 MW0.15%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 290 MW in total
  2. Stage 2 due to connect, 680 MW in total

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom

Data on this page