RARE CONTEXT Request research

Grid connection · England, United Kingdom

Edmonton Eco Park grid connection

Edmonton Eco Park grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, held by North London Waste Authority.

Map: where Edmonton Eco Park grid connection lies
51.6163, -0.0404 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Tottenham Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderNorth London Waste AuthorityUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity10 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWasteUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date26 Oct 2017UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date30 Mar 2026 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.6163, -0.0404UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Edmonton Eco Park grid connection is the 1,805th-largest of 3,539 grid connections in England and the 2,551st-largest of 4,870 in the United Kingdom by capacity; its 10 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,805th of 3,539341,715 MW<0.1%
United Kingdom2,551st of 4,870467,981 MW<0.1%
All grid connections in our data6,152nd of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 581 substations, 411 power plants (150 operating, 5,462 MW), 137 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
North London Heat and Power ProjectPower plant70 MWPermitted0.2 km
Edmonton EcoPark EfWPower plant55 MWOperating0.2 km
Edmonton 'B' CHP PlantPower plant18 MWCancelled0.3 km
Ark Data Centres Meridian ParkData center——0.4 km
North London (Electricity Line) ReinforcementTransmission line—Permitted1.5 km
Central Edmonton Primary 11kVSubstation——1.7 km
South Chingford Primary 11kVSubstation——2.2 km
Bury Grid 33kVSubstation——2.9 km
Virtus LONDON1Data center——4.1 km

Holder, grid operator and place

More from North London Waste Authority

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page