Grid connection · England, United Kingdom
Edmonton Eco Park grid connection
Edmonton Eco Park grid connection is a planned grid connection in England, United Kingdom, with 10 MW of capacity, held by North London Waste Authority.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Tottenham Grid 33kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Planned (accepted to connect) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | North London Waste Authority | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Capacity | 10 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Waste | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Queue date | 26 Oct 2017 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 30 Mar 2026 (target energisation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 51.6163, -0.0404 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
How it compares
Edmonton Eco Park grid connection is the 1,805th-largest of 3,539 grid connections in England and the 2,551st-largest of 4,870 in the United Kingdom by capacity; its 10 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,805th of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 2,551st of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 6,152nd of 8,618 | 1,355,288 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Was due to connect; the register does not list it as connected
Nearby
Within 50 km of this grid connection: 581 substations, 411 power plants (150 operating, 5,462 MW), 137 data centers (1 operating, 88 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| North London Heat and Power Project | Power plant | 70 MW | Permitted | 0.2 km |
| Edmonton EcoPark EfW | Power plant | 55 MW | Operating | 0.2 km |
| Edmonton 'B' CHP Plant | Power plant | 18 MW | Cancelled | 0.3 km |
| Ark Data Centres Meridian Park | Data center | — | — | 0.4 km |
| North London (Electricity Line) Reinforcement | Transmission line | — | Permitted | 1.5 km |
| Central Edmonton Primary 11kV | Substation | — | — | 1.7 km |
| South Chingford Primary 11kV | Substation | — | — | 2.2 km |
| Bury Grid 33kV | Substation | — | — | 2.9 km |
| Virtus LONDON1 | Data center | — | — | 4.1 km |
Holder, grid operator and place
More from North London Waste Authority
- North London Heat and Power (Edmonton EcoPark Replacement)70 MW · under construction
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.