RARE CONTEXT Request research

Grid connection · England, United Kingdom

Duck End Energy Park grid connection

Duck End Energy Park grid connection is a planned grid connection in England, United Kingdom, with 94.1 MW of capacity, held by EDP Renewables UK Limited.

Map: where Duck End Energy Park grid connection lies
52.2909, -0.1713 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Little Barford 132kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderEDP Renewables UK LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity94.1 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWindUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date8 Apr 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage132 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.2909, -0.1713UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Duck End Energy Park grid connection is the 423rd-largest of 3,539 grid connections in England and the 542nd-largest of 4,870 in the United Kingdom by capacity; its 94.1 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England423rd of 3,539341,715 MW<0.1%
United Kingdom542nd of 4,870467,981 MW<0.1%
All grid connections in our data3,315th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 442 power plants (172 operating, 2,930 MW), 124 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cotton Primary 11kVSubstation——2.8 km
Cotton FarmPower plant20 MWOperating3.5 km
GodmanchesterPower plant3 MWOperating3.8 km
Offord Primary 11kVSubstation——3.9 km
Godmanchester Primary 11kVSubstation——3.9 km
Station Farm Landfill SchemePower plant2 MWOperating4.1 km
West Cambridge Data CentreData center——19 km
Redcentric CambridgeData center——23 km
Data center, England (OSM way 87850427)Data center——30 km

Holder, grid operator and place

More from EDP Renewables UK Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page