Grid connection · England, United Kingdom

Dogger Bank South West grid connection

Dogger Bank South West grid connection is a planned grid connection in England, United Kingdom, with 1,450 MW of capacity, held by RWE Renewables UK Dogger Bank South (West) Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Birkhill Wood 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderRWE Renewables UK Dogger Bank South (West) LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDogger Bank South WestNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,450 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2030 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Nov 2031 (stage 2, cumulative 1,450 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Dogger Bank South West grid connection is the 37th-largest of 2,678 grid connections in England and the 54th-largest of 4,493 in the United Kingdom by capacity; its 1,450 MW is 0.32% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England37th of 2,678322,469 MW0.45%
United Kingdom54th of 4,493459,551 MW0.32%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 1,450 MW in total

Holder, grid operator and place

Other grid connections in England

All 3977 grid connections in England, United Kingdom