Grid connection · England, United Kingdom

Dogger Bank South East grid connection

Dogger Bank South East grid connection is a planned grid connection in England, United Kingdom, with 1,450 MW of capacity, held by RWE Renewables UK Dogger Bank South (East) Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Birkhill Wood 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderRWE Renewables UK Dogger Bank South (East) LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDogger Bank South EastNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,450 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Oct 2030 (stage 1, cumulative 400 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date30 Nov 2031 (stage 2, cumulative 1,450 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Dogger Bank South East grid connection is the 37th-largest of 2,533 grid connections in England and the 54th-largest of 3,903 in the United Kingdom by capacity; its 1,450 MW is 0.32% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England37th of 2,533319,370 MW0.45%
United Kingdom54th of 3,903446,745 MW0.32%
All grid connections in our data91st of 7,9281,372,494 MW0.11%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 400 MW in total
  2. Stage 2 due to connect, 1,450 MW in total