RARE CONTEXT Request research

Grid connection · England, United Kingdom

Coventry Farm grid connection

Coventry Farm grid connection is a planned grid connection in England, United Kingdom, with 47.5 MW of capacity, held by Ridge Clean Energy Limited.

Map: where Coventry Farm grid connection lies
52.1924, 0.2966 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Fulbourn Grid 132/33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderRidge Clean Energy LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity47.5 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date1 Dec 2026UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.1924, 0.2966UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

Coventry Farm grid connection is the 843rd-largest of 3,539 grid connections in England and the 1,196th-largest of 4,870 in the United Kingdom by capacity; its 47.5 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England843rd of 3,539341,715 MW<0.1%
United Kingdom1,196th of 4,870467,981 MW<0.1%
All grid connections in our data4,404th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 296 power plants (129 operating, 2,386 MW), 129 substations, 7 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Great Wilbraham Solar FarmPower plant38.1 MWOperating1.8 km
Newmarket Road, Bottisham - Battery Energy StoragePower plant50 MWPermitted2.8 km
Newmarket Road, Bottisham - Solar ArrayPower plant49.9 MWPermitted2.8 km
Fulbourn 11kVSubstation——7.4 km
Fulbourn Grid 33kVSubstation——7.4 km
Exning Primary 11kVSubstation——7.5 km
Redcentric CambridgeData center——11 km
West Cambridge Data CentreData center——15 km
US Air Force data center, BrandonData center——29 km

Holder, grid operator and place

More from Ridge Clean Energy Limited

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page