Grid connection · England, United Kingdom
Costessey Generation Site (Longwater Ind Est) grid connection
Costessey Generation Site (Longwater Ind Est) grid connection is a grid connection in England, United Kingdom, with 2.2 MW of capacity, held by Combined Landfill Projects.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Earlham Grid Local B 11kV) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Status | Operating (connected) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Holder | Combined Landfill Projects | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Earlham Grid Local B 11kV (via a primary substation) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Attached to | Costessey Landfill Gas Project 2 (matched by shared name+coordinates+technology+capacity+company, 0.93 km away) | Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026 |
| Capacity | 2.2 MW | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Technology | Landfill gas | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | Eastern Power Networks plc (UK Power Networks, East England licence area) | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Connection date | 1 May 2003 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 11 kV | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 52.6513, 1.1839 | UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Latest events
Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.
- Commissioned: Costessey Landfill Gas Project 2
- Permit granted: Costessey Landfill Gas Project 2 (planning authority South Norfolk, reference C/7/2002/7008)
- Permit applied for: Costessey Landfill Gas Project 2 (planning authority South Norfolk, reference C/7/2002/7008)
How it compares
Costessey Generation Site (Longwater Ind Est) grid connection is the 2,953rd-largest of 3,539 grid connections in England and the 4,078th-largest of 4,870 in the United Kingdom by capacity; its 2.2 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,953rd of 3,539 | 341,715 MW | <0.1% |
| United Kingdom | 4,078th of 4,870 | 467,981 MW | <0.1% |
| All grid connections in our data | 7,810th of 8,618 | 1,355,288 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 214 power plants (75 operating, 1,169 MW), 91 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Costessey Landfill Gas Project 2 | Power plant | 2 MW | Operating | 0.9 km |
| New Road Solar Farm | Power plant | 5 MW | Under construction | 1.8 km |
| Land to the west of Blind Lane | Power plant | 1.5 MW | Cancelled | 3.6 km |
| Earlham Grid Local 11kV | Substation | — | — | 3.9 km |
| Earlham Grid Local B 11kV | Substation | — | — | 3.9 km |
| Earlham Grid 33kV | Substation | — | — | 4.8 km |
| Norwich to Tilbury | Transmission line | — | Planned | 10 km |
Holder, grid operator and place
More from Combined Landfill Projects
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- UK Power Networks. UK Power Networks open data portal, CC BY 4.0.