Bradwell Energy Park grid connection is a planned grid connection in England, United Kingdom, with 1,050 MW of capacity, held by Dengie Peninsula Energy Park.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Rayleigh 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderDengie Peninsula Energy ParkNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toBradwell Energy ParkNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,050 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OnshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2034 (stage 2, cumulative 1,050 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (stage 1, cumulative 499 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Bradwell Energy Park grid connection is the 62nd-largest of 2,533 grid connections in England and the 97th-largest of 3,903 in the United Kingdom by capacity; its 1,050 MW is 0.24% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England62nd of 2,533319,370 MW0.33%
United Kingdom97th of 3,903446,745 MW0.24%
All grid connections in our data180th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 499 MW in total
  2. Stage 2 due to connect, 1,050 MW in total