Grid connection · England, United Kingdom

Battery storage 90 MW grid connection at Bridgwater Sgp

Battery storage 90 MW grid connection at Bridgwater Sgp is a grid connection in England, United Kingdom.

We hold more on this right.Attached to, capacity, connection date, grid operator, holder, location, queue date, status, technology and voltage: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
StatusAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
HolderAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Attached toAvailable on requestRare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
CapacityAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
TechnologyAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Grid operatorAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Queue dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Connection dateAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
VoltageAvailable on requestNGED Connected Data portal · Terms not verified · checked 24 Oct 2026
Coordinates51.1278, -2.9670NGED Connected Data portal · Terms not verified · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its owner? Ask us.

Nearby

Within 50 km of this grid connection: 397 power plants (169 operating, 1,152 MW), 23 substations, 6 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Summerway Drove, East Bower - Battery StoragePower plant90 MWPermitted0.2 km
Summerway DrovePower plant2 MWOperating0.6 km
Park Wall Solar ParkPower plant5 MWOperating0.9 km
Tata Communications Highbridge DatacentreData center——11 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned25 km
Insight Data LtdData center——26 km
Hinkley Point C ConnectionTransmission line—Permitted27 km
Larkhill PrimarySubstation——29 km
Chilton Cantello PrimarySubstation——30 km

Place

Other grid connections in England

All 3831 grid connections in England, United Kingdom