RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Muntjac Solar Farm grid connection

(ANM) Muntjac Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 50 MW of capacity, held by JAFA Solar Farm Limited.

Map: where (ANM) Muntjac Solar Farm grid connection lies
52.6980, 0.7478 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Swaffham Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderJAFA Solar Farm LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity50 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date26 Mar 2021UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.6980, 0.7478UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Muntjac Solar Farm grid connection is the 604th-largest of 3,539 grid connections in England and the 862nd-largest of 4,870 in the United Kingdom by capacity; its 50 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England604th of 3,539341,715 MW<0.1%
United Kingdom862nd of 4,870467,981 MW<0.1%
All grid connections in our data3,969th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 263 power plants (96 operating, 3,259 MW), 93 substations, 3 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Jafa, Great Dunham - Solar Photovoltaic Farm & Battery StoragePower plant49.9 MWCancelled1.4 km
Kempstone Primary 11kVSubstation——2.3 km
High Grove SolarPower plant720 MWPlanned4.7 km
Washpit DrovePower plant4.7 MWCancelled4.9 km
Swaffham Grid 33kVSubstation——6.9 km
Swaffham Grid 11kVSubstation——6.9 km
Longmarsh Green EnergyData center—Planned25 km
Kings Lynn B Connection ProjectTransmission line—Permitted26 km
US Air Force data center, BrandonData center——36 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page