(ANM) Coventry Farm grid connection

(ANM) Coventry Farm grid connection is a planned grid connection in England, United Kingdom, with 35 MW of capacity, held by Six Oaks Renewable Energy Park Limited.

Map: where (ANM) Coventry Farm grid connection lies
52.2059, 0.2917 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Fulbourn Grid 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderSix Oaks Renewable Energy Park LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity35 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date26 Jan 2022UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2031 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.2059, 0.2917UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Coventry Farm grid connection is the 1,015th-largest of 3,539 grid connections in England and the 1,445th-largest of 4,870 in the United Kingdom by capacity; its 35 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,015th of 3,539341,715 MW<0.1%
United Kingdom1,445th of 4,870467,981 MW<0.1%
All grid connections in our data4,735th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 294 power plants (130 operating, 2,390 MW), 128 substations, 7 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Newmarket Road, Bottisham - Battery Energy StoragePower plant50 MWPermitted1.2 km
Newmarket Road, Bottisham - Solar ArrayPower plant49.9 MWPermitted1.2 km
Great Wilbraham Solar FarmPower plant38.1 MWOperating2.6 km
Exning Primary 11kVSubstation——6.4 km
Fulbourn 11kVSubstation——7.4 km
Fulbourn Grid 33kVSubstation——7.4 km
Redcentric CambridgeData center——10.0 km
West Cambridge Data CentreData center——14 km
US Air Force data center, BrandonData center——28 km

Holder, grid operator and place

Other grid connections in England