Grid connection · the United Kingdom

East Anglia Two grid connection

East Anglia Two grid connection is a planned grid connection in the United Kingdom, with 880 MW of capacity, held by East Anglia Two Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUnited Kingdom (connects at EA2A and EA2B 275/66kV Offshore Platform)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (awaiting consents)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderEast Anglia Two LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toEast Anglia TwoNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity880 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Mar 2028 (stage 1, cumulative 860 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2030 (stage 2, cumulative 880 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

East Anglia Two grid connection is the 221st-largest of 3,903 grid connections in the United Kingdom by capacity; its 880 MW is 0.2% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
United Kingdom221st of 3,903446,745 MW0.2%
All grid connections in our data365th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 860 MW in total
  2. Stage 2 due to connect, 880 MW in total

Holder, grid operator and place

More from East Anglia Two Limited

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom