Dogger Bank Project 4 (Dogger Bank B) grid connection is a grid connection in the United Kingdom, with 1,200 MW of capacity, held by Doggerbank Offshore Wind Farm Project 2 Projco Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationUnited Kingdom (connects at Dogger Bank 220kV Offshores)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (built)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderDoggerbank Offshore Wind Farm Project 2 Projco LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toDogger Bank Project 4 (Dogger Bank B)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,200 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Dogger Bank Project 4 (Dogger Bank B) grid connection is the 84th-largest of 3,903 grid connections in the United Kingdom by capacity; its 1,200 MW is 0.27% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
United Kingdom84th of 3,903446,745 MW0.27%
All grid connections in our data155th of 7,9281,372,494 MW<0.1%

Holder, grid operator and place

Other grid connections in United Kingdom

All 5913 grid connections in the United Kingdom