Data center · Douglas County, Washington, United States
Microsoft EAT03
Microsoft EAT03 is a data center in Douglas County, Washington, United States, operated by Microsoft.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Douglas County, Washington | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 875 B Urban Industrial Way, East Wenatchee, WA 98802 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Microsoft | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 21,859 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 47.4183, -120.2077 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Microsoft owns 66 of the 1,336 data centers in the United States in our data with a named owner; 2 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% |
Nearby
Within 50 km of this data center: 885 water rights, 3 power plants (2 operating, 1,979 MW) and 3 mines (2 operating), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Groundwater water right G4-30431 | Water right | — | — | 1.1 km |
| Groundwater water right G4-30432 | Water right | — | — | 1.7 km |
| Columbia River water right S3-+00800CWRIS | Water right | — | — | 1.9 km |
| Rock Island | Power plant | 629 MW | Operating | 12 km |
| Rocky Reach | Power plant | 1,349 MW | Operating | 14 km |
| Quincy WA Plant | Mine | — | Operating | 34 km |
| SR Quincy Valley | Power plant | 130 MW | Under construction | 41 km |
| Potatoe Patch | Mine | — | Closed | 41 km |
| Quincy WA Mine | Mine | — | Operating | 45 km |
Operator and place
More from Microsoft
- Microsoft Fairwater Atlanta636 MW
- Microsoft Fairwater Wisconsin369 MW
- Microsoft Goodyear202 MW
- Microsoft Project Osmium190 MW
- Microsoft SAT4075 MW
- Nebius Mantsala75 MW
- Microsoft-Nebius New Jersey50 MW
- Microsoft SAT1447 MW
Other data centers in Washington
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.
- Washington Department of Ecology water rights (Water Rights Tracking System). Washington Department of Ecology water rights (Water Rights Tracking System), Ecology copyright information.