Data center · Prince William County, Virginia, United States

Microsoft Data Center 1

Microsoft Data Center 1 is a data center in Prince William County, Virginia, United States, with 146 MW of backup generators, operated by Microsoft and GCDC Purchaser Phase 1 LLC. It is in an area of high water stress.

Power and water

Water stress here is high: withdrawals take 60.2% of the renewable water supply of its sub-basin (WRI Aqueduct 4.0, baseline, score 3.6 of 5).

Distances run between the points of the records. How the grid and plants nearby are found; water stress from WRI Aqueduct 4.0.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPrince William County, VirginiaOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Virginia DEQ issued data center air permits · Public records · checked 24 Oct 2026
Address13760 University Boulevard, Gainesville, VA 20155OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Address13760 University Blvd, Gainesville, VA 20155Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Permit date29 Jul 2026 (permit 74241-4, Article 6 - mNSR)Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
OperatorMicrosoftOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorGCDC Purchaser Phase 1 LLCVirginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Backup generators146 MW (65 generator sets, permit 74241-4)Virginia DEQ issued data center air permits · record · Public records · checked 24 Oct 2026
Water stressHigh (40–80%) (score 3.6 of 5, withdrawals 60.2% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026
Building footprint23,139 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates38.8024, -77.5824OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

Also recorded as

2 sources record Microsoft Data Center 1; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Microsoft Data Center 1asset:osm:relation-19787207OpenStreetMap data centers—
Gainesville Crossing Data Campus - GCDCasset:va-deq:74241Virginia DEQ issued data center air permitsSame street address

How its operator compares

Microsoft owns 66 of the 1,335 data centers in the United States in our data with a named owner; 2 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United StatesRankData centersShare
Amazon Web Services1st14911%
Digital Realty Trust2nd906.7%
Microsoft3rd664.9%
Amazon Data Services Inc.4th604.5%
Google5th584.3%

Timeline

Dated facts about this data center from its sources, oldest first.

  1. Air permit to build issued (minor new source review), no. 74241-4
  2. GCDC Purchaser Phase 1 LLC on record as operator

Nearby

Within 50 km of this data center: 6 power plants (4 operating, 2,823 MW) and 1 mine, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.

NameKindSizeStatusDistance
Chantilly Crushed Stone IncorporatedMine—Operating15 km
Dulles Solar and StoragePower plant150 MWUnder construction18 km
Potomac Energy Center, LLCPower plant812 MWOperating29 km
RemingtonPower plant706 MWOperating33 km

Operators and place

More from Microsoft

Other data centers in Virginia

All 517 data centers in Virginia, United States

Data on this page