Data center · Bexar County, Texas, United States
Microsoft TRP2
Microsoft TRP2 is a data center in Bexar County, Texas, United States, with a 15,828 m² building, operated by Microsoft.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Bexar County, Texas | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Part of | Microsoft Texas Research Park Campus | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Microsoft | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 15,828 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 29.4120, -98.8040 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Microsoft owns 66 of the 1,336 data centers in the United States in our data with a named owner; 2 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% |
Nearby
Within 50 km of this data center: 12 power plants (4 operating, 4,094 MW) and 9 mines (8 operating), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ferdinand Energy Center | Power plant | 200 MW | Under construction | 23 km |
| Applewhite Sand Mine | Mine | — | Closed | 25 km |
| Dunlay Solar | Power plant | 180 MW | Planned | 30 km |
| Beckmann Quarry | Mine | — | Operating | 31 km |
| Bigfoot Mine | Mine | — | Operating | 34 km |
| El Patrimonio | Power plant | 150 MW | Planned | 34 km |
Operator and place
More from Microsoft
- Microsoft Fairwater Atlanta636 MW
- Microsoft Fairwater Wisconsin369 MW
- Microsoft Goodyear202 MW
- Microsoft Project Osmium190 MW
- Microsoft SAT4075 MW
- Nebius Mantsala75 MW
- Microsoft-Nebius New Jersey50 MW
- Microsoft SAT1447 MW
Other data centers in Texas
- OpenAI Stargate Abilene421 MW
- CoreWeave Denton TX262 MW
- Meta Temple178 MW
- Coreweave Helios132 MW
- Google Midlothian103 MW
- Google Red Oak77 MW
- Microsoft SAT4075 MW
- Microsoft SAT1447 MW
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.