Data center · Licking County, Ohio, United States
LCO 2
LCO 2 is a data center in Licking County, Ohio, United States, operated by Meta.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Licking County, Ohio | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Meta | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 28,286 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 40.0652, -82.7411 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Meta owns 41 of the 1,336 data centers in the United States in our data with a named owner; 8 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| Meta | 9th | 41 | 3.1% |
Nearby
Within 50 km of this data center: 6 mines (5 operating) and 5 power plants, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Flint | Power plant | 200 MW | Under construction | 3.5 km |
| Union Ridge Solar | Power plant | 108 MW | Under construction | 12 km |
| Harvey Solar | Power plant | 350 MW | Permitted | 23 km |
| Columbus Plant | Mine | — | Operating | 29 km |
| Columbus Limestone | Mine | — | Operating | 30 km |
| Saltillo Clay | Mine | — | Idle | 37 km |
Operator and place
More from Meta
- Meta Prometheus471 MW
- Meta-QTS Hillsboro 2180 MW
- Meta Jeffersonville178 MW
- Meta Rosemount178 MW
- Meta Temple178 MW
- Meta Montgomery153 MW
- Meta Cheyenne152 MW
- Meta Kuna152 MW
Other data centers in Ohio
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.