Water right · Yolo County, California, United States
Sacramento River irrigation right A000763
Sacramento River irrigation right A000763 is an appropriative water right in Yolo County, California, United States, with 270,748 acre-ft/year of face-value volume, held by Reclamation District #108.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | Water right A000763 (Appropriative) | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Location | Yolo County, California | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Status | Active | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Holder | Reclamation District #108 | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Volume | 270,748 acre-ft/year (face value) | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Priority date | 27 Aug 1917 | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Water use | Irrigation | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Water source | SACRAMENTO RIVER | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
| Coordinates | 38.8567, -121.7853 | eWRIMS Water Rights List · Public domain · checked 24 Oct 2026 |
Know more about this water right, or want an introduction to its holder? Ask us.
How it compares by face-value volume
Sacramento River irrigation right A000763 is the 97th-largest of 262 water rights in California by face-value volume, with 270,748 acre-ft/year. Ranks and totals cover the water rights in our data that report their face-value volume, not every one in existence. Storage and power rights are ranked apart and not added in.
| Within | Rank |
|---|---|
| California | 97th of 262 |
Nearby
Within 50 km of this water right: 3 power plants (1 operating, 636 MW), measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Sutter Energy Center | Power plant | 636 MW | Operating | 23 km |
| Skylight Renewable Energy | Power plant | 200 MW | Planned | 28 km |
| Country Acres Clean Power LLC | Power plant | 516 MW | Under construction | 34 km |
Holder and place
More from Reclamation District #108
- Sacramento River irrigation right S020716289,760 acre-ft/year
- Sacramento River irrigation right S020657108,660 acre-ft/year
- Sacramento River irrigation right S020661100,329 acre-ft/year
- Sacramento River irrigation right A00057697,469 acre-ft/year
- Sacramento River irrigation right A00158977,968 acre-ft/year
Other water rights in California
- Solano County municipal and irrigation right A0144439,004,510 acre-ft/year
- Rock Slough municipal and irrigation right A0056267,998,004 acre-ft/year
- Contra Costa County municipal and industrial right A0093647,818,798 acre-ft/year
- Colorado River irrigation and domestic right A0074827,239,775 acre-ft/year
- Contra Costa County municipal and irrigation right A0133705,347,832 acre-ft/year
- San Joaquin River municipal and irrigation right A0056383,917,478 acre-ft/year
- San Joaquin County municipal and irrigation right A0056283,349,944 acre-ft/year
- Contra Costa County irrigation and domestic right A0153753,030,762 acre-ft/year
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- eWRIMS Water Rights List. eWRIMS Water Rights List, Public domain.