Data center · Sacramento County, California, United States
RagingWire CA3
RagingWire CA3 is a data center in Sacramento County, California, United States, operated by NTT Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Sacramento County, California | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 1625 National Driveq, Sacramento, CA 95834 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | NTT Limited | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/sacramento-data-centers | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 14,083 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 38.6442, -121.4988 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
NTT Limited operates 22 of the 1,336 data centers in the United States in our data with a named owner; 10 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United States | Rank | Data centers | Share |
|---|---|---|---|
| Amazon Web Services | 1st | 149 | 11% |
| Digital Realty | 2nd | 87 | 6.5% |
| Microsoft | 3rd | 66 | 4.9% |
| Amazon Data Services Inc. | 4th | 60 | 4.5% |
| 5th | 58 | 4.3% | |
| NTT Limited | 11th | 22 | 1.6% |
Nearby
Within 50 km of this data center: 35 water rights (19 active), 7 power plants (2 operating, 1,193 MW) and 3 mines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Sacramento County municipal right A012321 | Water right | 443,479 acre-ft/year | Permitted | 4.8 km |
| Sacramento County municipal right A012622 | Water right | 966,175 acre-ft/year | Permitted | 4.8 km |
| Sacramento River municipal right A001743 | Water right | 81,800 acre-ft/year | Permitted | 5.7 km |
| Country Acres Clean Power LLC | Power plant | 516 MW | Under construction | 14 km |
| Perkins Plant | Mine | — | Operating | 15 km |
| Juniper Creek Storage | Power plant | 200 MW | Permitted | 27 km |
| Sacramento Valley Energy Center, LLC | Power plant | 300 MW | Under construction | 28 km |
| GMcB Lincoln Pits & Mill | Mine | — | Operating | 33 km |
| Capital Rock LLC | Mine | — | Operating | 44 km |
Operator and place
More from NTT Limited
- NTT Global Datacenters Frankfurt 4data center
- NTT Chicago CH1data center
- NTT VA6data center
- NTT VA9data center
- NTT Chicago CH2data center
- NTT Chicago CH3data center
- NTT Chicago CH4data center
- NTT VA7data center
Other data centers in California
Data on this page
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI data centers, CC BY 4.0.
- eWRIMS Water Rights List. eWRIMS Water Rights List, Public domain.
- MSHA Mines Data Set. MSHA Mines Data Set, Public domain.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Texas Comptroller qualifying data centers. Texas Comptroller qualifying data centers, Public domain.
- Virginia DEQ issued data center air permits. Virginia DEQ issued data center air permits, Public records.