Substation · Zeeland, Netherlands

150 kV substation (OSM way/1422828749)

150 kV substation (OSM way/1422828749) is a substation in Zeeland, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationZeelandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.4705, 4.0299OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 266 power plants (212 operating, 4,549 MW), 162 permit notices, 33 CO2 emitters (10 operating), 8 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Kruiningen (Solarius Sun United)Power plant23.9 MWOperating0.4 km
Nitrogen natuurvergunning decision, Reimerswaal (prb-2025-1163)Permit notice——0.7 km
Biomass heat Kruiningen (Lamb Weston)CO2 emitter—Operating1.2 km
Nitrogen natuurvergunning draft decision, Reimerswaal (prb-2026-14794)Permit notice——3.4 km
Nitrogen natuurvergunning draft decision, Reimerswaal (prb-2025-5224)Permit notice——3.9 km
Solar Kapelle (Coöperatieve Windenergie Vereniging Zeeuwind)Power plant1.69 MWCancelled3.9 km
Windpark LandmanslustPower plant12 MWPermitted5.3 km
Data Beheer Groep data center, GoesData center——9.2 km
DELTA FiberData center——10 km

Operator and place

More from TenneT

Candidate sites around this substation

6 sites of land near 150 kV substation (OSM way/1422828749) have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Zeeland

All 53 substations in Zeeland, Netherlands

Data on this page