Substation · the Netherlands

220 kV Hollandse Kust Zuid Beta

220 kV Hollandse Kust Zuid Beta is a substation in the Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNetherlandsOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage220 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.2577, 4.0847OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 338 permit notices, 275 power plants (216 operating, 7,263 MW), 57 CO2 emitters (27 operating), 46 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
HKZ Kavel IIIPower plant—Operating5.0 km
HKZ Kavel IIPower plant—Operating9.0 km
HKZ Kavel IVPower plant—Operating12 km
Grid connection omgevingsvergunning decision, Wassenaar (prb-2025-6352)Permit notice——24 km
Grid connection omgevingsvergunning application, Wassenaar (prb-2025-6013)Permit notice——24 km
Nitrogen natuurvergunning draft decision, Wassenaar (prb-2026-13917)Permit notice——24 km
Geothermal heat Noordwijk Zh (OMV GeoTherm NL)CO2 emitter—Permitted24 km
Geothermal heat 's-Gravenhage (Haagse Aardwarmte CR-Plein)CO2 emitter—Cancelled24 km
Geothermal heat Monster (HVC Aardwarmte Polanen)CO2 emitter—Operating26 km

Operator and place

More from TenneT

Other substations in Netherlands

All 816 substations in the Netherlands