Substation · Zeeland, Netherlands

150 kV Goes de Poel

150 kV Goes de Poel is a substation in Zeeland, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationZeelandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kV (levels 150, 50, 10 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.4903, 3.8638OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Know more about this substation, or want an introduction to its operator? Ask us.

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConneX5th20.45%

Nearby

Within 50 km of this substation: 197 power plants (160 operating, 1,791 MW), 12 CO2 emitters (9 operating), 7 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DELTA FiberData center——1.5 km
Data Beheer Groep data center, GoesData center——3.3 km
Solar Goes (Eneco Solar)Power plant4.98 MWOperating3.7 km
Solar 's-Heer Arendskerke (CCE Solar Fields 1 NL)Power plant2.44 MWOperating6.2 km
Solar Wilhelminadorp (Trio Solar 2)Power plant23.2 MWCancelled6.5 km
Biomass heat Wolphaartsdijk (Noordhoek Broilers)CO2 emitter—Operating6.5 km
Biomass heat Kruiningen (Lamb Weston)CO2 emitter—Operating12 km
Hydrogen electrolysis Vlissingen (Volth2)CO2 emitter—Cancelled20 km
Eurofiber data center NL South-West 2Data center——32 km