Substation · North Holland, Netherlands

150 kV Watergraafsmeer

150 kV Watergraafsmeer is a substation in North Holland, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth HollandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kV (levels 150, 10 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.3549, 4.9627OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 802 permit notices, 448 power plants (361 operating, 6,141 MW), 90 data centers, 69 CO2 emitters (41 operating), 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Equinix data center, AmsterdamData center——0.1 km
Equinix AM4Data center——0.1 km
Equinix AM3Data center——0.2 km
Biomass Diemen (Eteck Energie Techniek)Power plant1 MWOperating0.5 km
SURF Snellius Phase 1AI supercomputer91 H100eOperating0.8 km
SURF Snellius Phase 3AI supercomputer443 H100eOperating0.8 km
Data center omgevingsvergunning draft decision, Diemen (prb-2026-15202)Permit notice——2.7 km
Data center omgevingsvergunning application, Amsterdam (prb-2026-6693)Permit notice——2.8 km
Solar Amsterdam (Van Gendt Hallen)Power plant1.28 MWPlanned3.2 km

Operator and place

More from TenneT

Candidate sites around this substation

8 sites of land near 150 kV Watergraafsmeer have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in North Holland

All 79 substations in North Holland, Netherlands

Data on this page