Substation · Limburg, Netherlands

Vernieuwing hoogspanningsstation Maasbracht

Vernieuwing hoogspanningsstation Maasbracht is a 380 kV substation in Limburg, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLimburgOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage380 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.1490, 5.9197OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 691 permit notices, 422 power plants (294 operating, 5,316 MW), 21 CO2 emitters (15 operating), 16 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
ClauscentralePower plant1,304 MWOperating1.0 km
Solar Montfort (Attero Solar Parks WM)Power plant15.3 MWOperating1.5 km
Energiepark GroensebosPower plant12.8 MWOperating2.4 km
Solar park omgevingsplan draft decision, Roerdalen (gmb-2024-532147)Permit notice——2.6 km
Solar park omgevingsplan decision, Roerdalen (gmb-2025-413507)Permit notice——2.7 km
Nitrogen natuurvergunning application, Roerdalen (prb-2025-12792)Permit notice——3.0 km
Data center, Roermond (OSM way 289816687)Data center——6.8 km
Biomass heat Roggel (Doehler Roggel)CO2 emitter—Operating15 km
Biomass heat Neer (Pluimveebedrijf Beenders)CO2 emitter—Operating15 km

Operator and place

More from TenneT

Other substations in Limburg

All 66 substations in Limburg, Netherlands

Data on this page