Substation · Limburg, Netherlands

150 kV Beek

150 kV Beek is a substation in Limburg, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLimburgOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates50.9432, 5.8072OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 402 permit notices, 249 power plants (171 operating, 4,428 MW), 13 CO2 emitters (9 operating), 10 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Beek Lb (Retail Center Beek)Power plant1.55 MWOperating1.0 km
Solar Beek Lb (Sunrock Assets XII)Power plant15 MWCancelled1.3 km
Nitrogen natuurvergunning application, Beek (prb-2025-10919)Permit notice——1.4 km
Solar Geleen (Helwig Vastgoed)Power plant1.29 MWOperating1.9 km
Nitrogen natuurvergunning application, Beek (prb-2026-9292)Permit notice——3.4 km
Battery storage omgevingsvergunning application, Beek (gmb-2025-3841)Permit notice——3.4 km
Chemelot BKG 01CO2 emitter2,820,546 tCO2e—3.7 km
Heat pump Brunssum (Stichting Weller Wonen)CO2 emitter—Operating11 km
Electric boiler Maastricht (Sappi Maastricht)CO2 emitter—Operating12 km

Operator and place

More from TenneT

Candidate sites around this substation

1 site of land near 150 kV Beek has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Limburg

All 66 substations in Limburg, Netherlands

Data on this page