Substation · Gelderland, Netherlands

150 kV Zuilichem

150 kV Zuilichem is a substation in Gelderland, Netherlands, operated by TenneT.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationGelderlandOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
OperatorTenneTOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage150 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.8016, 5.1318OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the operator.

Request research

How its operator compares

TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in NetherlandsRankSubstationsShare
TenneT1st42797%
ProRail2nd61.4%
DSM/Chemelot3rd30.68%
Stedin3rd30.68%
EdgeConnex5th20.45%

Nearby

Within 50 km of this substation: 725 permit notices, 690 power plants (538 operating, 5,458 MW), 83 CO2 emitters (47 operating), 16 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Solar Brakel (EGP Solar Brakel I)Power plant1.13 MWOperating2.1 km
Solar Brakel (EGP Solar Brakel II)Power plant1.3 MWOperating2.7 km
Solar Nieuwaal (Deliflor Hoogveld)Power plant1 MWCancelled3.0 km
Nitrogen natuurvergunning decision, Zaltbommel (prb-2026-16241)Permit notice——3.2 km
Nitrogen natuurvergunning draft decision, Zaltbommel (prb-2026-13374)Permit notice——3.3 km
Battery storage omgevingsvergunning application, Altena (gmb-2026-288719)Permit notice——4.4 km
Biomass heat Vuren (Sonac Vuren)CO2 emitter—Operating5.1 km
Green gas Waalwijk (Wabico)CO2 emitter—Operating11 km
Aquathermal heat Gorinchem (N.V. HVC)CO2 emitter—Operating12 km

Operator and place

More from TenneT

Candidate sites around this substation

19 sites of land near 150 kV Zuilichem have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

All sites in Gelderland

Other substations in Gelderland

All 81 substations in Gelderland, Netherlands