Substation · Gelderland, Netherlands
150 kV Dale
150 kV Dale is a substation in Gelderland, Netherlands, operated by TenneT.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Gelderland | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Operator | TenneT | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 150 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.9468, 6.5765 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its operator? Ask us.
How its operator compares
TenneT operates 427 of the 440 substations in the Netherlands in our data with a named owner; the most of any owner. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in Netherlands | Rank | Substations | Share |
|---|---|---|---|
| TenneT | 1st | 427 | 97% |
| ProRail | 2nd | 6 | 1.4% |
| DSM/Chemelot | 3rd | 3 | 0.68% |
| Stedin | 3rd | 3 | 0.68% |
| EdgeConneX | 5th | 2 | 0.45% |
Nearby
Within 50 km of this substation: 339 power plants (225 operating, 2,494 MW), 20 CO2 emitters (16 operating), 2 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Aalten (One Solar VIII) | Power plant | 1.8 MW | Operating | 2.7 km |
| Solar Aalten (Ducona Vastgoed) | Power plant | 1.5 MW | Operating | 3.2 km |
| Solar Aalten (Arentsen Beheer) | Power plant | 1.1 MW | Operating | 3.3 km |
| Green gas Lichtenvoorde (Biologische Industriële Reststoffenverwerking) | CO2 emitter | — | Operating | 5.9 km |
| Green gas Lichtenvoorde (Biologische Industriële Reststoffenverwerking) | CO2 emitter | — | Permitted | 5.9 km |
| Biomass heat Beltrum (Groot Zevert Vergisting) | CO2 emitter | — | Operating | 15 km |
| Equinix Enschede | Data center | — | — | 37 km |
| Eurofiber data center Arnhem 1 | Data center | — | — | 44 km |
| ProHiPerSi | Processing plant | — | — | 50 km |
Operator and place
More from TenneT
- 220 kV Hollandse Kust Zuid Betasubstation
- 110 kV AVIsubstation
- 110 kV Salincosubstation
- 380 kV Centrale Diemensubstation
- 150 kV Haarlemmermeersubstation
- 150 kV Windpark Krammersubstation
- 150 kV Google Datacenter Middenmeersubstation
- 380 kV Tilburgsubstation
Other substations in Gelderland
Data on this page
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.