Substation · Gelderland, Netherlands
150 kV Arnhem
150 kV Arnhem is a substation in Gelderland, Netherlands, operated by Liander.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Gelderland | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Operator | Liander | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 150 kV (levels 150, 10 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.9755, 5.9199 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its operator? Ask us.
How its operator compares
Liander operates 2 of the 440 substations in the Netherlands in our data with a named owner; 4 owners have more. Counts cover the substations in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in Netherlands | Rank | Substations | Share |
|---|---|---|---|
| TenneT | 1st | 427 | 97% |
| ProRail | 2nd | 6 | 1.4% |
| DSM/Chemelot | 3rd | 3 | 0.68% |
| Stedin | 3rd | 3 | 0.68% |
| EdgeConneX | 5th | 2 | 0.45% |
| Liander | 5th | 2 | 0.45% |
Nearby
Within 50 km of this substation: 463 power plants (354 operating, 2,824 MW), 46 CO2 emitters (29 operating), 5 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Arnhem (Retail Center De Lely) | Power plant | 1 MW | Operating | 1.1 km |
| Raedthuys Windpark Koningspleij | Power plant | 3.6 MW | Operating | 1.2 km |
| Solar Arnhem (Zwaluwstaart Holdings) | Power plant | 6 MW | Permitted | 1.2 km |
| Eurofiber data center Arnhem 1 | Data center | — | — | 1.6 km |
| Green gas Bemmel (Groen Gas Gelderland) | CO2 emitter | — | Operating | 6.5 km |
| Green gas Bemmel (Groen Gas Gelderland) | CO2 emitter | — | Permitted | 6.5 km |
| Solar thermal Nijmegen (Nyma Makersplaats Vastgoed) | CO2 emitter | — | Planned | 14 km |
| BIT-2 Datacenter | Data center | — | — | 21 km |
| BIT-1 Datacenter | Data center | — | — | 21 km |
Operator and place
More from Liander
- 110 kV substation (OSM way/1551706688)substation
- Substation omgevingsvergunning application, Amsterdam (gmb-2024-490259)permit notice
- Substation omgevingsvergunning decision, Amsterdam (gmb-2024-545457)permit notice
- Substation omgevingsvergunning decision, Amsterdam (gmb-2025-178571)permit notice
- Substation omgevingsvergunning decision, Amsterdam (gmb-2025-182730)permit notice
- Substation omgevingsvergunning application, Amsterdam (gmb-2025-201439)permit notice
- Grid connection instemmingsbesluit decision, Leidschendam-Voorburg (gmb-2025-301304)permit notice
- Grid connection instemmingsbesluit decision, Leidschendam-Voorburg (gmb-2025-353811)permit notice
Other substations in Gelderland
Data on this page
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.