Data center · Arnhem, Gelderland, Netherlands
Eurofiber data center Arnhem 1
Eurofiber data center Arnhem 1 is a data center in Arnhem, Gelderland, Netherlands, operated by Eurofiber Cloud Infra.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Arnhem, Gelderland | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Tivolilaan 251, 6824BV Arnhem | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Eurofiber Cloud Infra | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://www.eurofiber.com/en-nl/data-centers-netherlands/data-center-arnhem-1 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.9870, 5.9340 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchNearby
Within 50 km of this data center: 439 power plants (333 operating, 2,738 MW), 80 substations, 44 CO2 emitters (27 operating) and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Arnhem (Retail Center De Lely) | Power plant | 1 MW | Operating | 1.3 km |
| Raedthuys Windpark Koningspleij | Power plant | 3.6 MW | Operating | 1.6 km |
| Solar Arnhem (Zwaluwstaart Holdings) | Power plant | 6 MW | Permitted | 1.6 km |
| 150 kV Arnhem | Substation | — | — | 1.6 km |
| 150 kV Kattenberg | Substation | — | — | 3.8 km |
| Green gas Bemmel (Groen Gas Gelderland) | CO2 emitter | — | Operating | 7.9 km |
| Green gas Bemmel (Groen Gas Gelderland) | CO2 emitter | — | Permitted | 7.9 km |
| 150 kV Elst | Substation | — | — | 7.9 km |
| Electric boiler Eerbeek (Neenah Coldenhove) | CO2 emitter | — | Planned | 14 km |
Operator and place
Other data centers in Gelderland
Data on this page
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.