Substation · the United Kingdom
WAENFAWR T1
WAENFAWR T1 is a 33 kV primary substation in the United Kingdom, with 3.5 MVA of demand headroom and 10.2 MVA of generation headroom, operated by SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | United Kingdom | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | SP Manweb plc (SP Energy Networks, North Wales, Merseyside and Cheshire licence area) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 3.5 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Generation headroom | 10.2 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 7.5 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 53.1239, -4.2014 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 69 power plants (26 operating, 4,651 MW), 47 grid connections (38 operating, 578 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Glyn Rhonwy Pumped Storage | Power plant | 99.9 MW | Permitted | 3.5 km |
| Glyn Rhonwy (larger version) | Power plant | 99.9 MW | Cancelled | 4.6 km |
| Glyn Rhonwy grid connection | Grid connection | 99.9 MW | Planned | 4.6 km |
| Parciau Solar Park grid connection | Grid connection | 15 MW | Operating | 5.1 km |
| Parciau Farm Solar Park | Power plant | 13.9 MW | Operating | 5.3 km |
| Ferodo (Swn y Mor) grid connection | Grid connection | 5 MW | Operating | 5.5 km |
| North Wales Wind Farms Connection | Transmission line | — | Permitted | 49 km |
Grid operator and place
More from SP Manweb plc
- Aberdyfi T1substation
- Abergele T1 / Pensarn T1substation
- Abergele T1 / Pensarn T1substation
- Abersoch T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
- Aberystwyth T1 / North RD T1 / Parc-Y-Llyn T1 / Parc-Y-Llyn T2 / U C Wales T1substation
Other substations in the United Kingdom
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.