Substation · Scotland, United Kingdom
Harvest Avenue Primary
Harvest Avenue Primary is a 33 kV primary substation in Scotland, United Kingdom, with 19.5 MVA of demand headroom and 0 MW of generation headroom, connected by Scottish Hydro Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Scotland | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 19.5 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 12 / 24MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary substation | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Dyce GSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Replace both transformers with 7.5 / 15MVA units (due Mar 2026) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (green on the heat map) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 57.1964, -2.2171 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 215 power plants (66 operating, 658 MW), 124 grid connections (56 operating, 419 MW) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| ABDN Farburn Terrace - Battery grid connection | Grid connection | 30 MW | Planned | 1.7 km |
| Farburn Place - Battery Energy Storage Facility | Power plant | 30 MW | Under construction | 2.0 km |
| Battery storage 49.9 MW grid connection at Dyce Grid | Grid connection | 49.9 MW | Planned | 2.0 km |
| Generation 2.85 MW grid connection at AECC | Grid connection | 2.85 MW | Operating | 2.1 km |
| Dyce Energy Storage, Raiths Industrial Estate - Battery Facility | Power plant | 50 MW | Operating | 2.4 km |
| Stoneywood Paper Mill | Power plant | 22 MW | Cancelled | 2.9 km |
| Brightsolid | Data center | — | — | 6.0 km |
Grid operator and place
More from Scottish Hydro Electric Power Distribution plc
- Abernethy GSPsubstation
- Abernethy Primarysubstation
- Balbeggie Primarysubstation
- Bridge of Earn Primarysubstation
- Errol Primarysubstation
- Glendevon Primarysubstation
- Milnathort Primarysubstation
- Harbour Primarysubstation
Other substations in Scotland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.