RARE CONTEXT Request research

Substation · England, United Kingdom

Wendover Primary 11kV Substation

Wendover Primary 11kV Substation is an 11 kV primary substation in England, United Kingdom, with 6.1 MVA of demand headroom and 15 MVA of generation headroom, operated by Eastern Power Networks plc (UK Power Networks, East England licence area).

Map: where Wendover Primary 11kV lies
51.7593, -0.7431 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Demand headroom6.1 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Generation headroom15 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Firm capacity18 MVAUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
LevelPrimary substationUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.7593, -0.7431UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Nearby

Within 50 km of this substation: 405 power plants (141 operating, 3,551 MW), 289 grid connections (173 operating, 1,752 MW) and 109 data centers (1 operating, 88 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Moat Farm - Solar FarmPower plant24.1 MWCancelled5.5 km
(ANM) Bishopstone grid connectionGrid connection20 MWOperating5.7 km
Gib Lane (Aston Clinton solar park)Power plant24.2 MWOperating5.8 km
Arla Foods grid connectionGrid connection6 MWOperating5.9 km
Kimblewick Road Solar FarmPower plant40 MWPermitted6.6 km
Aston Clinton Farm grid connectionGrid connection20 MWOperating7.5 km
Data center, England (OSM way 1460602301)Data center—Under construction11 km
Data center, England (OSM way 1254986167)Data center——15 km
CapitaLand Ascendas REIT data center, High WycombeData center——16 km

Grid operator and place

More from Eastern Power Networks plc

Other substations in England

All 2633 substations in England, United Kingdom

Data on this page